Posts Tagged ‘Dale Howe’

Building Works: Day 19 - Dry Concrete, New Partition Wall and Parking

Friday, December 19th, 2008

Dry Concrete Floor in Family RoomFantastic! The concrete dried and the Farm has changed in perspective again. Now there is a single floor throughout downstairs the place really seems to have opened up. Now we need to fit the Celotex (floor insulation), get the UFH laid onto it, and then finish the floor with 75mm of screed. It’s great to think that we will have a modern insulated floor with under floor heating, in a 200 year old farm house!

We also decided to bring forward putting in a couple of extra parking bays as we had some hard core going spare and Liam was still on site with the JCB and we could get rid of the earth with the earth excavated from in the house.

(more…)


Building Works: Day 12 Continues - Another Break Through and Old Partition Wall

Friday, December 12th, 2008

Bedroom Cut ThroughMark and Dale have been busy today (this does not imply they are not busy on other days!) with some really noticable results. Firstly the cut through into the master bedroom to create the new corridor, needed to resolve the en suite bedroom issue and allow us to put our bed central to the window allowing us to wake up and survey ‘our land’ :) !

Also, the old stud partition wall between bedroom 3 and 4 is now cleared so the new studs can be put up allowing the old ones to be removed. It’s really exciting when ‘big’ things happen like this as one has a real sense of progress.

Bedroom Cut Through Bedroom Side Old Partition Wall


Building Works: Day 12 - More Digging and Another Wall Down

Friday, December 12th, 2008

Reed Lathe and Plaster WallNot content with continuing to dig out the floors, Mark and Dale have removed another wall upstairs between two bedrooms to even up the size of the rooms.

The internal walls in the old parts of the house are incredible, being constructed of Norfolk reeds, lathes and plaster. You can see in the picture just how amazing these look, and can even see the reed heads still on the reeds themselves.

(more…)


Building Works: Day Ten - Family Room Door Cut Through

Wednesday, December 10th, 2008

Family Room Door CutExciting day today as we saw the cut through of the new door way into the Family Room.

It was a very messy business in terms of dust, at one stage it looked like the house was on fire with the dust bellowing out of the open doors and windows. Mark and Dale appeared like snowmen, Mark actually took on a rather festive Father Christmas type appearance!

(more…)


Building Works: Day Nine - ‘Man, whoops, Wall down!’

Tuesday, December 9th, 2008

Downstairs Cloakroom WallI think Mark and Dale were getting wall removal withdrawl symptoms, so we agreed to take some more down! (Hey what is another few walls amongst friends?!) ;)

The walls in question ‘made up’ the downstairs cloakroom, however, they sat on top of the concrete pad that we need to remove, so it made the most sense to take them down.

(more…)