To Do List 2010!

It might seem a bit late to share this, but we sat down at the beginning of the year and made the following list of targets we wanted to achieve on The Farm in 2010:

(update Dec 2010 – to include the other things we managed to get done!)

Inside:

  • Install 2 x wall lights in ensuite bathroom – complete!
  • Install 6 x downlighters in family bathroom
  • Family Room/Kitchen completed – apart from the decorating!
  • Lino in downstairs toilet
  • Flooring in Hall & study
  • Finish Loft Insulation and platforms – complete!
  • Finish sorting out loft boxes
  • Shelving in airing cupboard
  • ‘Dress’ ensuite to an interim standard
  • ‘Dress’ family bathroom to an interim standard
  • ‘Dress’ downstairs toilet to an interim standard
  • Paint E’s bedroom
  • Paint M’s bedroom
  • Paint O’s bedroom
  • Decorate Hall
  • Sort out dodgy plaster in study
  • Hang door on ensuite
  • Install energy bulbs on the landing
  • Explore options for internal doors – had made and fitted 3 downstairs
  • Explore window options – complete!
  • Source a carpenter – complete!
  • Insulate and plasterboard underside of stairs
  • Cut out opening in chimney for cooker
  • Install new window in family room
  • Repair airing cupboard wall
  • Repair cupboards in M’s bedroom – complete!
  • Repair lead flashing on chimneys
  • Fit additional Sun Pipe over stairs
  • Complete stair case – a little bit of filling to do, but all wood in place!
  • Wire up radiator probe in en-suite – complete!

Outside:

  • Lighting:
    • Outside socket on West end of house
    • Security lights on utility end wall; patio and front of house – complete!
    • Security lights on garage x 3
    • Electricity into stable and put up festoon
    • Electricity into garage plus sockets and overhead light
  • Commission and erect House Sign
  • Explore planning application for stable – in progress
  • Plant up large shrubbery – complete!
  • Plant up front bed – complete!
  • Edge large shrubbery
  • Edge small shrubbery
  • Edge front bed
  • Plant Laurel’s in front of neighbour’s garage – Complete!
  • Install guttering on garage
  • Paint the garage and sort out climbing plants (both sides?)
  • Finish stable doors with bolts etc.
  • Put up front fencing – hedging still to be planted
  • Put up fencing for vegetable garden – complete!
  • Put up fencing for chickens
  • Prepare ground for coppice – complete!
  • Plant willow setts for coppice
  • Plant ornamental garden trees – complete!
  • Plant weeping willow by ‘pond’ in paddock
  • Get chickens
  • Prepare 2 raised beds – actually made 4
  • Spray off triangular bed, remove shrubs and re-turf (leave cherry for now?)
  • Gravel driveway
  • Lay turf in the rest of the turning circle
  • Re-seed over land drain
  • Get some play equipment for the kids (cement swings in)
  • Touch up outside paint where necessary
  • Paint boundary fence at the front
  • Plant in gaps of boundary fence

I think we must be mad…but in two months of BAD weather we have achieved a lot and the items in progress are near completion so not a bad two months of work!

Nigel – 1st March 2010

You can see that we didn’t manage to complete everything on our list, but we realise now that it was a pretty long list. However, given everything else going on in our lives, we are proud of what we have managed to achieve, and when we draw up the list for 2011, we will be far more realistic! We’re getting there :)

Tammy – 22nd December 2010